Construction, Developing and Maintenance of Roads and Interchanges for New Terminal Building in Kuwait Airport on Maqwa Road Project
RA/268
Project Brief
The RA/268 Project’s scope of work includes Construction, Developing and Maintenance of Roads and Interchanges for New Terminal Building in Kuwait Airport on Maqwa Road Project
Civil Infrastructure
Roads & Bridges
Micro-tunneling
Project Description
Project Owner
Ministry of Public Works (MPW)
Consultant
Oriental Consultants / Dar Al Dowailah Engineering Consultants and Construction Managers
Contractor
LIMAK İNŞAAT SANAYI VE TICARET A.Ş.
Sub-Contractor
United Gulf Construction Co. W.L.L.
Sub-Contract Value
USD 167,836,087 (KWD 51,440,316)
Scope of Work
The RA/268 Project’s scope of work involves construction of Interchanges (IC), Roads, Bridges and Infrastructure works.
- INTERCHANGES (IC):
- IC1 – RA @ Grade, Trough for Rt. 51, 2 Directional Flyovers
- IC2 – Full Cloverleaf @7RR, 2 Directional Flyovers
- IC3 – 2 RA @ Grade, 1 Trough for EXIT, 2 Bridges for ENTRANCE
ROADS:
- 31 km Road Length
- 2 to 7 LNs (in addition to Emergency Lanes)
BRIDGES:
- 2500m Bridges – 13 Nos.
- 3600m MSE Walls
- 2150m Trough – 2 Nos.
- Pedestrian Bridges – 2 Nos.
- Bus Bays – 4 Nos.
UTILITIES:
Relocation / Protection of Existing Utilities







