Construction of Sewer Network for C3B Area - Seeb Catchment, Oman

OWWSC/T/2459831/2023/D103/2024

Construction of Sewer Network for C3B Area – Seeb Catchment, Oman 

OWWSC/T/2459831/2023/D103/2024

Project Brief

The OWWSC/T/2459831/2023/D103/2024 Project’s scope of work includes Construction of Sewer Network for C3B Area – Seeb Catchment, Oman.
5
Electro-mechanical
5
Micro-tunneling
5
Water and Wastewater Management

Project Schedule

5
Date of Commencement

26-08-2024

5
Date of Completion

26-08-2027

Project Description

5
Project Owner
Nama Water Services (Oman Water & Wastewater Services Co.)
5
Contractor
United Gulf Construction Co. W.L.L.
5
Contract Value
OMR 10,300,000 (KWD 8,200,000)

Scope of Work

The Scope of work for Contract C3B shall include but not limited to the construction (Supply, Installation & Commissioning) of the following:

 

  • Gravity sewer network/s ranging inner diameter from 200 mm to 600 mm
  • Gravity sewer manholes (lateral plus trunk)
  • House connection and rider sewers ranging diameter from 100mm to 185 mm
  • Property chambers, House connection chambers, Gravity sewer manholes (for Rider Lines)
  • The contractor shall design and construct the house connections for all plots located in the project area.
  • Single Rising Mains with different diameter
  • C3B Pumping Stations (PS2 & PS4 & PS6)

 

The work shall include the following (but not limited to):

 

  • Procurement and Construction of pump station, building complete with all civil, electrical, mechanical, plumping, firefighting, HVAC, Instrumentation & control and ICA works.
  • Supply and installation of flow meter chamber, inlet valve chamber complete with all associated works.
  • Provision for power supply from MEDC source till transformer building
  • Construction of roads, fence works.
  • Construction of Roads Crossing (open cut & Trenchless method) and complete with all necessary works.