+965 2205 4250 ugcc@ugcc.com

Infrastructure Works for the Commercial Berth at DUQM Port (IP3), Oman

C50/2015

Infrastructure Works for the Commercial Berth at DUQM Port (IP3), Oman

C50/2015

Project Brief

The C50/2015​ Project’s scope of work involves construction, Installation, testing, commissioning and remedying of defects of Road and paving works, infrastructure works and building works.

5
Building Construction
5
Roads and Bridges
5
Civil Infrastructure
5
Electro-mechanical

Project Schedule

5
Date of Commencement

01-12-2015

5
Date of Completion

31-12-2020

Project Description

5
Project Owner

Special Economic Zone Authority (SEZAD), Oman

5
Consultant

Royal Haskoning / Khatib & Alami and Partners

5
Contractor

United Gulf Construction Co. W.L.L.

5
Contract Value
USD 200,600,000 (OMR 77,100,000)

Scope of Work

The C50/2015 Project involved Construction, Installation, testing, commissioning and remedying of defects of Road and Paving Works, Infrastructure works and Building Works​

5
Roads and Paving Works

Construction of 8 km roads and paving, all internal roads as access to building and parking areas, construction of parking areas, traffic signals, road furniture and road markings, construction of 2 Nos Helipad of area each 2,200m2 and Reefer Gantry 84 units

5
Civil Infrastructure
  • All related earth works Cut/Fill, including Import/Disposal as necessary and pavement structure for both flexible (asphalt) and rigid (concrete and concrete heavy duty) pavements
  • The Infrastructure Works comprised of Potable water network, firefighting network, storm water drainage, sewerage network, pump stations, electrical works, telecommunications, street lighting, yard lighting, spare ducts, fencing and gate works and STP 305 m3/day
5
Building Construction Works

The Building Construction Works include building at the commercial berth zone (pre-gate, Gates and inspection zone) is included and ancillary buildings are Pass office building, transaction building, mosque, electrical service building, firefighting water tank, general building, Custom – MOH administration and inspection building, MAF inspection building, MOH clinic, Staff building and ammunition building

5
Project Statistics
  • 8,911,932 m3 of bulk earth works (Cut/fill/disposal)
  • 1069 Nos pile works – dia 600mm (8m to 12m depth)
  • 53,080 Metric Ton Asphalt Paving Works
  • 145,317 m3 of reinforced (RC) Concrete Works
  • 8,863 metric tons of steel Rebars
  • 4.5 km Potable Network – HDPE Pipe (Dia 225mm)
  • 8.92 km Firefighting Network – HDPE Pipe (Dia 250mm & 315mm)

Gallery

View all current projects