General Civil Works (Civil and Tank – C & T) at Al-Zour Refinery
ZOR/EPC-0059
Project Brief
The ZOR/EPC-0059 – SC No. The ZOR/EPC-0059 – SC No. 1391328 Project involves General Civil Works [Civil and Tank (C & T)] at Al-Zour Refinery
Building Construction
Roads and Bridges
Civil Infrastructure
Oil and Gas
Project Schedule
Year of Commencement
2016
Year of Completion
2023
Project Description
Project Owner
Kuwait National Petroleum Company (KNPC) – Kuwait Integrated Petroleum Industries Company (KIPIC)
Consultant
AMEC Foster Wheeler Group LTD.
Contractor
Essar-Saipem J/V
Sub Contractor
United Gulf Construction Co. W.L.L.
Contract Value
USD 114,200,000 (KWD 35,150,000)
Project Details
The ZOR/EPC-0059 Project involves Concrete Works, Pipe Crossing Culverts, Dyes and Earthworks, and Road Works
Concrete Ring Wall Foundations for Storage Tanks
- 30 nos. of tanks, diameter 10 meters to 78 meters
- Includes inserts, leak detection systems, etc.
Concrete Sleepers
S3 (1660 No’s),S2 (719 No’s) & S4
Pipe Crossing Culverts
Dykes
- Including Bitumen sand lining on sloped surfaces of embankments
Earthworks
- Structural Fill and Clean Sand fill Inside Tank Foundations
- Structural Fill for Earthen Embankment for Dyke Walls, Roads, Ramps, etc.
- Site Grading
Misc. Concrete Support for Equipment and Pipes as per Plan
- Underground Drainage System of AOC, COC, and Clean Storm Water (CSW)
- Total length of 18km with RC pipes of diameter 600mm to 2100mm dia.
- Firewater pipe Network – Civil works – 45 KM
- Manholes, Catch Basins & Sumps
- RCC manholes Catch Basins for the 18 Km drainage Network system
- Concrete Ditches
- Civil Works Related to Electrical & Instrumentation
- PVC Pipes, Concrete Plinths, Protection Tiles
- Final Site Grading
Road Works
Asphalt Works that includes Dyke Bund Liner ( 122,078 Sqm ) and Bitumen sand lining on sloped surfaces of embankments